Click Here for an important announcement regarding Stewart Engineering.
Home - Quest Design Group

Twin Lakes Park

Twin Lakes Park:

  • A new single 9,000 square foot building plus renovation of a 17,300 s.f. building “A” to house the Orioles Spring training baseball team.
  • Building “A” renovation to bring into compliance with current code requirements.
  • Design a piping system, with pump for water service to water closet and urinals from a Cistern designed and installed by others.
  • Provided technical services for this LEED Gold Facility.
  • Prepared the necessary LEED templates for posting by the LEED facilitator.
  • Provided fundamental LEED commissioning.
  • Assist with project scheduling.
  • Assist with detailed cost estimate.
  • Provided construction documents for all M/P/FP/E trades.
  • Provided support of the bid phase answering questions from bidding contractors.
  • Provided Florida Model Energy Form Calculation and forms.
  • Provided material submittal and shop drawing reviews along with contractor progress reviews during the construction phase of the project.